Power System Operation Corporation Ltd.
(A wholly owned subsidiary of Power Grid Corporation of India Ltd.)
POSOCO
Southern Regional Load Despatch Center
About Us
Downloads
Information Centre
Contact Us
Other RLDCs
Search
Introduction
Installed Capacity
SRLDC Documents
WriteUps/Papers
Brief Details
Role Of RLDC
Role Of SRLDC
Role Of SLDC
Roles & Functions-NLDC
Administrative Information
Reports
Contact Us
NLDC
NRLDC
WRLDC
ERLDC
NERLDC
Content Search
Home
Scheduling
Open Access
Commercial
Reports
REC Mechanism
Quick Links
Weather
Complaint Management
SRLDC E-Mail
SRLDC Intranet
Disclaimer
Web Based Scheduling
Time Table
Declared Capability
Entitlements
Drawl Schedules
Despatch Schedules
Inter Regional Schedules
Unrequisitioned Surplus
Open Access Transactions
PX Transactions
Implemented Schedules
Summary
Web Based STOA Program
STOA Status Reports
Transfer Capability
SRLDC STOA Bank Account Details
Non-Concented STOA Applications
Curtailment Details
STOA Disbursement Details
Procedure for Scheduling Bilateral Transactions
STOA Charges
Scheduling Loss
e-Bidding For Open Access Transactions
Procedure for Scheduling Collective Transactions
CERC/SERC Orders
Other Documents
Transfer Capability State
Monthly ATC
SEM Logistics
Allocation
Weekly Sem Data
UI Trends
Monthly OverDrawl/UnderInjection
Daily
Weekly
Monthly
Quarterly
Yearly
Sem Logistics ...
SEMs IN SR
Location Diagram
Inj./Drwl. Computation
Future Req. of SEMs
Technical Details
1. Location Wise Details
i) ISGS
RSTPS
Talcher STPP-II
NLC TS2 Stage 1,2
NLC TPS-1 EXP
MAPS
KGS
ii) Beneficiaries
APTRANSCO
KPTCL
KSEB
TNEB
PONDICHERRY
GOA
PG-HVDC
iii)
CTU
2.
Summary Of SEMs
3.
Constituent Summary
4.
Master Frequency Meters
1. General
400 KV System
State Owned Inter State Lines
CTU Network
400 KV Sub Station
2. ISGS
Ramagundm STPS
Talcher STPP-II
NLC
MAPS
KGS
3. Drawee Utilities
APTRANSCO
KPTCL
TNEB
KSEB
PONDICHERRY
GOA
PG-HVDC
1. Injection By ISGS
RSTPS
Talcher STPP-II
NLC TS2 Stage 1,2
NLC TPS-1 EXP
MAPS
KGS
ER-WR
2. Drawl By Utilities
APTRANSCO
KPTCL
KSEB
TNEB
PONDICHERRY
GOA
PG-HVDC
1.
NLC TS-II Expansion
2.
Kundankulam APP
3.
Kaiga
4.
System Strengthening
1.
Technical Specification
2.
Salient Features
3.
Operating Instructions
4.
Software Installation
5.
Data Format
6.
Typical Metering Diagram
7. Draft SEM Manual
i)
Description of items in draft sem manual
ii)
SEM DETAILS as on 01.01.10
iii)
Future SEM meters
iv)
Sem Loc Diagrams as on 01.01.2010
Reliability, Security and Economy in Power Transmission
Best viewed with 1024 by 768 Screen Resolution
:
©2000-2007 POWERGRID